SubAir Elite
As
the budget allows, SubAir Elites can be added, two or three each year, to the
rest of the golf course. SubAir Project Managers can assist in long range
planning and strategy to ensure smooth installation over an extended time
period.
To install SubAir, the course will need USGA specification greens or California style greens. No matter which SubAir product is chosen, the SubAir Operation Package is required to connect the drainage system to SubAir. These components can be installed during construction, during renovation projects, or while the course is open for play. Installation does not disrupt play and all the work is performed off the green so it will not interfere with golfers on the course.
Elite Specifications
Blower
Max. Air Flow (1200 CFM);
Max. Vacuum 22" (WG);
Max. Pressure 24" (WG);
Motor 7.5 hp wash-down duty motor/direct drive;
Impeller Anti-corrosion aluminum
Enclosure - Direct Burial Vault
Corrugated dual-wall HDPE;
Dimensions 57" Dia. x 35.5" H
Weight 650 lbs;
Prewired and includes wire run of 100 ft. to attach vault
to control panel
Blower Pressure Switch
Vault Temperature Switch
Power switch and magnetic
Safety Interlock
Distributed Separator
Air Separator Assembly
HDPE / PVC configuration
Dual Valve Assembly
One piece PVC construction
Control Panel
Standard Enclosure Molded plastic
17"W x 16"D x 41"H
Optional Enclosures - Built to suit
Irrigation Control Signal Interface
24-volt AC on/off, pressure/vacuum
Service Indicator Light Illuminates when service is required
Safety Disconnect Power interlock switch
Noise Reduction
Sound attenuator connected to intake/exhaust
Power Requirement Options
230 volt 1 phase - 33 AMPS full load
208 volt 3 phase - 18.5 AMPS full load
230 volt 3 phase - 17.4 AMPS full load
460 volt 3 phase - 8.7 AMPS full load
Other power supplies accommodated by special order

